Unofficial volunteer resource. Not affiliated with Devcon or the Ethereum Foundation.

Home / Roles / Supporters and Impact Booths

Role 05

Supporters and Impact Booths

The booths that help pay for Devcon, and the impact booths that deserve the same visibility. You help them run smoothly.

The basics

Supporters are the projects, companies and initiatives that back Devcon. They choose their booths and pay to be at the event, which helps keep Devcon sustainable. In a way, this area is Devcon supporting its supporters.

Impact booths are for very impactful projects and non-profit foundations that probably have no budget but still deserve great visibility. You will find them spread through the venue.

Every supporter has a booth in Jasmine 01, where they meet the community and show what they are building. Your job is to make sure every booth works, is clean and has what it needs, and to help attendees find them.

Some supporters have a booth for only 2 days (the first two or the last two), others for all 4. This team works closely with the local production team. Check in at the Volunteer Check-In desk with the Coordination Support team. The desk is on the right as you enter through Gate 20, Ground Floor (Level 0), and Volunteer HQ is Level 1, Suite 103.

Your team

Each area has two Volunteer Leads, one for the morning shift and one for the afternoon. Your Volunteer Lead is your first point of contact on shift. Names come from Volunteer Training Session #2 on 16 October 2026 and can change.

RoleWho
Devcon areaSupporters, with the local production team
Devcon workstream leadsHana
Volunteer lead, AM shiftSimona, @Simona_Serban on Telegram
Volunteer lead, PM shiftSarthi, @sarthib7 on Telegram
Supporters Program LeadJuana, @juanaorl on Telegram, for supporter requests
ProductionWinnie, @winnie_pigpigiezz on Telegram, for booth build, equipment, cleaning, storage and move-in and move-out
Shobiz (production company)Everything to do with the booth build: missing items, extra furniture and repairs
SNL (AV agency)Everything technical at the booth: TVs and monitors, screens and cables
WhatsApp groupYou will be added to a group with Shobiz and SNL to report booth issues directly

Supporters list

Supporters rotate. Group A has the booth on Days 1 and 2 (Tue 3 and Wed 4 November), Group B on Days 3 and 4 (Thu 5 and Fri 6 November). Two teams can share one booth number, each with its own storage block, marked A or B.

SupporterTierBoothDaysStorage block
BaseFlagshipFlagship 014 daysF01
GnosisCoreCore 014 daysC01
KlerosCoreCore 024 daysC02
GolemCoreCore 034 daysC03
OpenZeppelinCoreCore 044 daysC04
ENSStarterStarter 01Day 1 to 2 (A)S01-A
OrdocodeStarterStarter 024 daysS02
NethermindStarterStarter 03Day 1 to 2 (A)S03-A
CircleStarterStarter 03Day 3 to 4 (B)S03-B
Bitget WalletStarterStarter 04Day 1 to 2 (A)S04-A
DedaubStarterStarter 04Day 3 to 4 (B)S04-B
WorldStarterStarter 05Day 1 to 2 (A)S05-A
ZKP2PStarterStarter 05Day 3 to 4 (B)S05-B
Trail of BitsStarterStarter 06Day 1 to 2 (A)S06-A
Fair Food DataStarterStarter 06Day 3 to 4 (B)S06-B
SWARMImpactStarter 074 daysS07
LFDTImpactStarter 084 daysS08
EEZImpactStarter 094 daysS09
CrossbarImpactStarter 104 daysS10
UNICEFImpactStarter 114 daysS11
KohakuImpactStarter 12Day 1 to 2 (A)S12-A
Money LeagueImpactStarter 12Day 3 to 4 (B)S12-B
EAGImpactStarter 134 daysS13
EIPsInsightImpactStarter 14Day 1 to 2 (A)S14-A
DAO Fund, CotabeImpactStarter 14Day 3 to 4 (B)S14-B
growthepieImpactStarter 154 daysS15
GCC CommonsImpactStarter 16Day 1 to 2 (A)S16-A
ZiskImpactStarter 16Day 3 to 4 (B)S16-B
ETH LabsImpactStarter 174 daysS17
RailgunImpactStarter 184 daysS18
WalletbeatImpactStarter 194 daysS19
Nimbus (Logos)ImpactStarter 204 daysS20
GrapheneImpactStarter 21Day 1 to 2 (A)S21-A
GainforestImpactStarter 21Day 3 to 4 (B)S21-B
CoW SwapCoffee StationActivation4 daysNone

What every booth needs

All booths are turnkey. Production builds them with furniture, power and monitors, and each has its own built-in storage. Every booth must always have:

  • Working monitor or monitors.
  • An HDMI cable and an ethernet cable.
  • A monitor remote control.
  • Power working and furniture in place.

If something is missing or broken, report it in the WhatsApp group. Booth build, furniture or missing items go to Shobiz. TVs, monitors, screens, cables and other tech go to SNL.

TierSizeMonitors
Flagship100 sqm4
Core50 sqm2
Starter and Impact12 sqm1

Timing

Day 1, Tue 3Day 2 and 3, Wed 4 to Thu 5Day 4, Fri 6
Early access (Exhibitor Wristband)7:00 AM7:00 AM7:00 AM
Booths ready and doors open8:30 AM9:00 AM9:00 AM
Booth hours8:30 AM to 5:00 PM9:00 AM to 5:00 PM9:00 AM to 3:30 PM
Venue close6:30 PM6:30 PM7:30 PM

Shared storage

  • Each booth has its own storage block in the shared storage area.
  • Teams store items by booth number and storage block number, and everything stays inside their own block.
  • Access is only with an Exhibitor Wristband.
  • Flagship and Core blocks are 9 sqm. Starter and Impact blocks are 4 sqm.

Gaming Space

The Gaming Space runs all 4 days. Check it regularly during your shift: everything is clean with no cups or trash left around, and everything works (screens, consoles and devices, controllers, power). Report any problem straight away to Winnie (Production) or Juana.

Hardware Zone

The Hardware Zone runs all 4 days. Check it regularly during your shift: everything is clean with no cups or trash left around, and everything works (screens, devices, power). Report any problem straight away to Winnie (Production) or Juana.

Your tasks

Start of shift

  • Walk all booths. Every booth must be ready by 9:00 AM, or 8:30 AM on Day 1.
  • Check each booth has monitors, HDMI, ethernet cable and remote control working.
  • Let your lead know which teams have not arrived.

During the day

  • Check booths are clean. If not, ask Production to call the cleaning service.
  • Keep aisles clear, with no boxes or bags outside booths or storage blocks.
  • No selling, and no food or drinks offered at booths. If you spot this, do not say anything to the supporter. Flag it straight away to Juana, who will handle it.
  • Check in with each supporter team to see if they need anything.
  • Help attendees find booths.

End of shift

  • Remind every supporter team not to leave merch or valuables in the booth. Everything goes to their storage.
  • Booths closed and tidy.
  • Report any issue before you leave: broken equipment, damage or missing items.

Changeover, Wed 4 to Thu 5 November

  • Wed 6:00 to 7:30 PM: Group A packs and leaves. Their booths and "-A" storage blocks must be empty. Report any Group A team still there after 7:30 PM.
  • Thu 7:00 to 9:00 AM: welcome Group B and show them their booth and "-B" storage block.
  • All Group B booths must be ready by 9:00 AM.

Who to call

IssueContact
Equipment, cleaning, storage, WiFi, move-in and move-outWinnie (Production)
Booth build, furniture or missing itemsShobiz, in the WhatsApp group
TVs, monitors, screens, cables or other techSNL, in the WhatsApp group
Supporter requests, activations, complaintsJuana (Supporters)
Urgent or not sureYour Volunteer Lead

Lost and found

Attendees will ask where to report a lost item or see what has been handed in. Send them to the Devcon Lost & Found app, where they can browse found items, report a lost one and see how to claim it with the item's reference number.

If someone hands you a found item, take it straight to the cloakroom desk, so it is logged with a photo and stored safely.

Before your shift

Plan your commute with the shift planning table, check what to carry, and save the emergency numbers.

← Stage All roles General Floor and Runners →